docs: GS-2400 series runs LCOS SX 4, not SX 3

LANCOM's LCOS SX release page assigns SX 3.34 only to GS-2326P+,
GS-2326+, GS-2310P+, GS-2310 and GS-2328F, and SX 4.30 to the
XS/GS/IGS-3000 and GS-2400 series. The GS-2426 was listed under SX 3 from
a misread lifecycle table. Move it, add GS-2412, GS-3252P and GS-3528XP
to the SX 4 table, and record which series run SX 5.

Refs NetOrk/netork#1094
This commit is contained in:
Christian Manivong committed 2026-10-13 01:01:33 +02:00
1 parent 4c4805bae3
commit 57dd646e8f
4 files changed
+30 -13

No files matched your search

+13 -3
View File
@@ -1,17 +1,26 @@
# LCOS SX 4 (GS-3xxx)
# LCOS SX 4 (GS-24xx, GS-3xxx)
Candidate first target alongside [LCOS SX 3](lcos-sx3.md), because SX 4 is closer to the
switches LANCOM sells today.
## Devices
From LANCOM's lifecycle tables (checked 2026-10-13):
LANCOM's LCOS SX release page lists **LCOS SX 4.30** for the XS/GS/IGS-3000 series and the
GS-2400 series. SX 5 covers XS-6000, XS-5000, XS/GS-4500 (5.20) and the CS and YS series
(5.30). Lifecycle data (checked 2026-10-13):
| Model | Firmware | End of sale | End of life | Successor |
|---|---|---|---|---|
| GS-3152X | LCOS SX 4.30 | 2023-08 | 2028-08 | GS-3628X |
| GS-3152XP | LCOS SX 4.30 | 2023-03 | 2028-03 | GS-3652XP |
| GS-3152XSP | LCOS SX 4.30 | 2023-08 | 2028-08 | GS-3652XUP |
| GS-3252P | LCOS SX 4.30 | 2023-03 | 2028-03 | R&S GS-3252P |
| GS-3528XP | LCOS SX 4.30 | 2025-04 | 2030-04 | GS-3628XP |
| GS-2412 | LCOS SX 4.30 | current | | |
The GS-2412 is a current product: 10 × 1 GbE, 2 × SFP, fanless, no PoE, layer 2+ only (no
routing). The rows above were read through an automated summary of the lifecycle tables;
verify a row on the source page before relying on it.
All three are past end of sale with no further major releases. The GS-3152X has 48 ×
1 GbE, 4 × SFP+ (10 GbE) and "layer 3 lite" (static routing, DHCP server). Other GS-3xxx
@@ -27,7 +36,8 @@ models and their SX versions: see the lifecycle tables.
SX 3 forces.
- **Layer 3 lite** adds ARP, routes and DHCP server leases to what a driver can read.
Trade-offs: SX 4 reaches end of life in 2028-08, two years before SX 3. A 48-port switch is
Trade-offs: the GS-31xx/32xx models reach end of life in 2028, two years before SX 3; the
GS-35xx and the current GS-24xx run longer. A 48-port switch is
large for a desk; check fan noise and power draw before buying (not checked).
## Documentation